Doha
A 6-month diversion will be in place on a three-kilometre stretch of Al Jamaliya Road on both directions, starting from April 16.
During the period, traffic will be diverted to an adjacent, newly constructed temporary road with one lane in each direction.
The diversion is to allow for the upgrade of the existing road and the construction of a new dual carriageway with two lanes in each direction. The new road which is part of Al Jamaliya, Leatooriya, and Al Sheehaniya Expressway project will have permanent median island as well as pedestrian and cyclist pathways.
The construction of Al Jamaliya, Leatooriya, Al Sheehaniya project is part of Ashghal’s Expressway Programme, and it aims to enhance the traffic capacity and road safety in the area. The project also includes a wide range of works to develop the area’s infrastructure, installation of Intelligent Transport Systems, and a comprehensive drainage system.
New strains, family visits cause more Covid-19 cases in children
'No allowance deduction for teachers due to Covid-19'
Tarsheed saves QR300mn in 2020 by reducing energy, water usage
Qatar calls for political solution to end rights violations in Syria
QU hosts webinar on strengthening children’s nutrition during pandemic
MoCI conducts draw to lease shops in Abu Nakhla market
Ramadan amid Covid-19 is 'a wake-up call'
381 face prosecution for violation of Covid norms
Indian Navy ship arrives in Qatar
There are no comments.