The Public Works Authority has announced a new layout for the roundabout linking Street 33 and Al Kassarat Street in the Industrial Area while keeping the existing lanes open for six months from Friday (January 15).

This is to enable conversion of the roundabout into two level interchange as part of Street 33 Upgrade Project.

Ashghal will install road signs advising motorists of the temporary closure and urged all to follow them and abide by the speed limit to ensure safety.



Related Story